摘要
延迟焦化冷焦过程中用高浓度污水替代1.0MPa蒸汽进行冷焦,不仅可以降低使用蒸汽而产生的装置能耗,而且可以处理部分污水处理厂难以处理的高浓度污水,减少污水排放。该工艺在中海石油舟山石化有限公司2.4 Mt/a的延迟焦化装置的应用表明,可以降低能耗237.02GJ/d,减少高浓度污水外排75t/d,是一项节能环保的新工艺。
The commercial application of high concentration wastewater in cooling coke process instead of 1.0 MPa steam in a 2.4 Mt a delayed coking unit of CNOOC Zhoushan Petrochemical Company was introduced,which not only can reduce the use of steam and unit energy consumption,and also can handle some high concentration wastewater that is difficult to treat in swage water treatment plant. The application results showed that the reduction of energy consumption is about 237.02 GJ d,the discharged out wastewater is reduced about 75 t d.
作者
贾正万
陈进旺
冯声波
Jia Zhengwan;Chen Jinwang;Feng Shengbo(CNOOC Ningbo Daxie Zhoushan Petrochemical Company,Zhoushan,Zhejiang 316015)
出处
《石油炼制与化工》
CAS
CSCD
北大核心
2018年第12期64-66,共3页
Petroleum Processing and Petrochemicals
关键词
延迟焦化
高浓度污水
焦炭塔
蒸汽
delayed coking
high concentration wastewater
coking drum
steam