摘要
本文针对厦门华润中心项目的现场实际,对"莫兰蒂"台风中倒塌塔式起重机的的拆除方案进行对比分析和深化设计,阐述了倒塌塔式起重机高空拆除的具体施工方案和主要控制措施,为类似的工程提供参考。
Aiming at the actual situation of Xiamen China Resources Center Project, this paper makes a comparative analysis and deepening design on the demolition scheme of the collapsed tower crane in "Moranti" typhoon. The concrete construction scheme and main control measures for high altitude demolition of collapsing tower crane are expounded, which provides reference for similar projects.
作者
吴志纯
Wu Zhichun(Xiamen Shundan Special equipment Inspection Co.,Ltd.,Xiamen,Fujian 361000)
出处
《江西建材》
2018年第13期125-126,共2页
Jiangxi Building Materials
关键词
塔式起重机
台风
高空拆除
Tower crane
Typhoon
High altitude demolition.