摘要
近年来,城市轨道交通BIM技术应用大量涌现,但各地开展模式、存在问题以及各方理解差异很大,导致BIM技术在城市轨道交通中的应用效果参差不齐。本文从建设方的需求出发,详细介绍了北京地铁19号线的BIM总体管理体系包括:BIM应用标准、BIM协同工作平台、BIM数据集成与管理平台、各阶段的BIM应用,并在典型工点进行示范应用,为建设单位的工程建设管理提供了可视化的管理工具,为其他城市的BIM技术应用提供实施思路。
In recent years, the application of BIM technology in urban rail transit has emerged in large numbers. However, the modes, problems and understandings of various localities have changed greatly, which has led to the uneven application effect of BIM technology in urban rail transit. Based on the needs of the builders, this paper introduces in details the BIM overall management system of Beijing Subway Line 19, including BIM application standards, BIM collaborative work platform, BIM data integration and management platform, BIM applications at various stages and at typical work sites. Demonstration application provides a visual management tool for the construction management of the construction company, and provides implementation ideas for BIM technology applications in other cities..
作者
罗平
王辉
高银鹰
张志伟
杜新明
关惠龙
Luo Ping1,2,Wang Hui3,Gao Yinying;Zhang Zhiwei;Du Xinming;Guan Huilong(Beijing MTR Construction Administration Co., Ltd., Beijing 100068, China;Beijing Key Laboratory of Fully Automatic Operation and Safety Monitoring for Urban Rail Transit, Beijing 100068, China;Beijing Rail and Transit & Research Institute Co., Ltd., Beijing 100068, China;
Xi’an Railway Engineering Co., Ltd., of China Railway Seventh Bureau Group Co., Ltd., Xi’an 710032, China)
出处
《土木建筑工程信息技术》
2018年第5期38-45,共8页
Journal of Information Technology in Civil Engineering and Architecture
基金
北京市科技计划项目(编号:Z171100000517001)“北京市国资委城市轨道交通BIM-GIS数字化建设创新团队”