摘要
以实际工程为例,对计算方案及工况进行了讨论,并对计算成果进行有效分析;研究该水电站冲沙闸防渗墙的结构设计,提出的各项安全系数都符合相关标准.该工程中防渗墙的施工具备非常便捷的优势,其对地形的适应性良好,保证了施工项目的顺利进行.
Taking the actual project as an example, the paper discusses the calculation scheme and working condition, analyzes the calculation results effectively, then studies the structure design of sand sluicing gate side wall in hydropower station, and the safety factors proposed are conformed to the relevant standards. The cutoff wall construction tools in this project have very convenient advantages, and its adaptability to the terrain is good, thus ensuring the smooth progress of the construction project.
作者
王飞
WANG Fei(Large Dam Safety Supervision Center,National Energy Administration,Hangzhou 311122 ,China)
出处
《工程建设与设计》
2018年第21期161-163,共3页
Construction & Design for Engineering
关键词
基础处理
结构布置
防渗墙施工
foundation treatment
structural arrangement
cutoffwall construction