摘要 地连墙加钢筋混凝土支撑的基坑,支撑结构与主体结构冲突,底板施工时进行立柱桩托换。因无法按原设计方案进行新增立柱桩施工,通过在承台底部位置增加条形基础,基础顶部进行钢管吊装回顶,底部灌浆浇筑密实,支撑梁底搭设钢管吊架供施工人员进行钢柱固定等操作,成功地解决了新增立柱桩无法按原设计用旋挖钻机施工等问题,从而为类似工程提供借鉴。 The foundation pit with reinforced concrete braces and the supporting structure are in conflict with the main structure. The new column pile construction can not be carried out according to the original design scheme. By adding the strip foundation at the bottom of the cap, the steel pipe is hoisted back to the top at the top of the foundation, the bottom grouting is dense, the steel pipe hanger is set up for the construction personnel to fix the steel column, and the new column pile can not be designed according to the original design. Some problems such as the construction of rotary drilling rig and so on, thus providing reference for similar proiects.
作者 程永康 张蝶 Cheng Yong-kang;Zhang Die
出处 《建筑技术开发》 2018年第18期73-74,共2页 Building Technology Development
关键词 基坑立柱桩托换 支撑梁下立柱回顶 钢管吊架 foundation pillar pile underpinning support beam lower column back to top steel pipe hanger
  • 相关文献

参考文献5

二级参考文献30

共引文献87

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部