摘要
结合盐泰锡常宜铁路桥位处的工程地质条件,从静力分析,施工难度和工期要求等方面对斜拉桥方案和悬索桥方案进行了对比,在目前的科技条件下(高性能材料、分析理论和先进的施工装备),斜拉桥方案优于悬索桥方案。
By means of static analysis, operational difficulty analysis and construction period analysis, also considering the engineering geological condition of Yan Tai Xi Chang Yi railway bridge, cable-stayed bridge plan and suspension bridge plan are compared. Under present scientific conditions, which means using high performance material and advanced construction equipment, cable-stayed bridge plan is superior to Suspension bridge plan.
作者
毛耀增
陈侃
刘洋
胡俊豪
MAO Yao-zeng;CHEN Kan;LIU Yang;HU Jun-hao(JSTI Group,Nanjing Jiangsu 210019 China)
出处
《江苏建筑》
2018年第4期60-62,共3页
Jiangsu Construction
关键词
过江通道
斜拉桥
悬索桥
桥式方案比选
Yangzi River Channel
cable-stayed bridge
suspension bridge
bridge project selection