摘要 因制造和运输条件的限制,变换炉需整体吊装,吊装时的设备受力决定了吊装过程是否安全可行。对变换炉筒体吊装时的水平和垂直状态进行受力分析,并对吊耳进行有限元应力分析,以确保变换炉整体吊装过程的可行性和安全性,为吊装方案编制工作奠定了基础,也为同类设备的吊装受力分析提供了参考。 Due to restriction of fabrication and transportation conditions, the converter furnace has to be integrally hoisted and the loading three on the furnace determines whether or not the hoisting process is sate and feasible. In this paper, horizontal and vertical conditions during the hoisting operation were mechanically analyzed and the numerical simulation of the vertical lug was performed to ensure both safety and feasibility of the hoist process. This study lays a theoretical basis for the preparation of the lilting scheme and also provides the experience for the hoisting of similar equipment.
作者 黄君领 钱才富 赵小辉 张宝珠 马忠明 HUANG Jun-ling;QIAN Cai-fu;ZHAO Xiao-hui;ZHANG Bao-zhu;MA Zhong-ming(College of Mechanical and Electrical Engineering,Beijing University of Chemical Technology;Henan Xinlianxin Chemical Fertilizer Co.,Ltd.;Liao Cheng Luxi Chemical Engineering Design Co.Ltd.)
出处 《化工机械》 CAS 2018年第5期581-585,共5页 Chemical Engineering & Machinery
关键词 变换炉 整体吊装 受力分析 有限元 converter furnace inteqral lilting three analysis finite element method
  • 相关文献

参考文献8

二级参考文献19

共引文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部