期刊文献+

300 MW机组抽汽余热带发电项目研究与探讨

Research and Discussion on Power Generating Project with the Residual Heat from Extracted Steam of 300 MW Unit
下载PDF
导出
摘要 大型钢铁公司内部蒸汽余能、余热可利用空间较大,公司自备300 MW发电机组三段抽汽经减温减压后送至蒸汽管网,具有一定的能源损失及季节性波动,根据机组抽汽能力增设发电机组,使蒸汽能源二次分配、利用,有效回收余能,发电创效。 Large steelmakers have great internal waste energy and waste heat to be re- covered. The three-stage steam extraction of the self-owned 300 MW power generating unit of Shougang Jingtang Steel was delivered to steam pipe network after temperature and pres- sure reduction, having some energy loss and seasonal fluctuation. Power generating units were added based on steam extraction capacity, resulting in secondary distribution and utilization of steam energy, effective recovery of waste energy and creating benefit with power generating.
作者 刘磊 马占朋 杜学忠 佟兴强 杨星辉 LIU Lei;MA Zhanpeng;DU Xuezhong;TONG Xingqiang;YANG Xinghui(Shougang Jingtang United Iron and Steel Co,Ltd,Tangshan,Hebei 063200,China)
出处 《冶金动力》 2018年第11期40-42,49,共4页 Metallurgical Power
关键词 余能 抽汽 能源损失 季节性波动 带发电 residual energy steam extraction energy loss seasonal fluctuation carryover power generatmg
  • 相关文献

参考文献1

二级参考文献13

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部