摘要
进行北京至沈阳铁路客运专线北台子隧道施工时,通过建立健全质量管理体系,推行各级岗位质量负责制,明确隧道施工各工序质量控制要点及措施并在施工时坚决落实。同时在隧道施工时还运用了多项"四新"技术,有效确保了隧道的施工质量。
During the construction of the Beijing-Shenyang Railway Passenger Dedicated Line Beitaizi Tunnel, through the establishment of a sound quality management system, the implementation of the quality responsibility system at all levels, clear the quality control points and measures of each process of tunnel construction and resolutely implement them during construction. At the same time, a number of "four new" technologies were used during the tunnel construction, which effectively ensured the construction quality of the tunnel.
作者
和欣
HE Xin(The Fourth Engineering Co.,Ltd.of China Railway First Group,Xianyang 712000,China)
出处
《价值工程》
2018年第31期66-68,共3页
Value Engineering
关键词
铁路隧道
质量控制
关键点
四新技术
railway tunnel
quality control
key points
four new technologies