摘要
斜拉索索力和标高质量控制是工程项目建设施工质量控制管理中的重要内容。文章结合东合大桥工程实例,介绍了斜拉索索力及标高质量控制过程及措施。
The cable force and standard elevation quality control of stayed cable are the important contents in construction project quality control and management.Combining the example of Donghe Bridge project,this article introduced the cable force and standard elevation quality control process and measures for stayed cables.
作者
韦东成
WEI Dong-cheng(Guangxi Xianglu Construction Co.,Ltd.,Nanning,Guangxi,530021)
出处
《西部交通科技》
2018年第7期176-178,共3页
Western China Communications Science & Technology
关键词
斜拉索
索力
标高
质量控制
Stayed cable
Cable force
Elevation
Quality control