摘要
岸边集装箱起重机(以下简称岸桥)的轨道在设计、制造及安装过程中,因各综合因素的影响,使轨道设备投产运行后出现一系列问题。论文结合实际生产情况,对岸桥的轨道设计、制造安装工艺出现的常见问题进行分析,并提出解决方案,以供参考。
The orbit ofquayside container crane (hereinafter referred to as seashore container crane) has a series of problems after it was putted into operation, it was caused by the all affecting factors in the process of design, produce and installation. Based on the actual production situation, the paper analyzes the common problems in rail design and manufacturing and installation of the seashore container crane and puts forward the solution, for reference