期刊文献+

600 MW机组湿法脱硫超低改造工程常见问题及处理 被引量:2

Common Problems and Treatment on 600 MW Unit Wet Desulphurization Super Low Reengineering Project
下载PDF
导出
摘要 随着环保要求越来越严,火力发电厂对其管辖的环保设施投入也不断在加大投入,超低排放技术的大面积应用,使得大量新技术、新装备广泛应用在我国的脱硫脱硝技术改造现场,系统设备改造前后发生巨大变化,随之出现一些新问题,技术人员如何能准确的掌握和管理,实现脱硫现场安全环保经济运行,显得非常迫切。文章针对火电厂脱硫超低排放改造工程中发生的常见问题进行分析,并提出一些处理方法,供相关工程人员参考,有一定的工程借鉴意义。 As environmental protection requirements become more stringent, and as thermal power plants increasingly invest in the environmental protection facilities under their jurisdiction, the large -, scale application of ultra - low emission technologies has made a large number of new technologies and new equipment widely used in the desulfurization and denitrification technologies in our country. This paper analyzes the common problems in desulphurization ultra -low emission transformation project of thermal power plant and puts forward some treatment methods for the reference of relevant engineers. Key words: Wet desulfurization ; Gypsum ; Operation diagnosis
作者 何君 HE Jun(Datang Environment Industry Group Co.,Ltd.Franchise Branch,Nanjing 211100,China)
出处 《应用能源技术》 2018年第8期27-29,共3页 Applied Energy Technology
关键词 湿法脱硫 超低改造 工程 Wet desulfurization Gypsum Operation diagnosis
  • 相关文献

同被引文献2

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部