摘要
地铁建设工程中,地下水不仅会影响到工程质量、工程进度,而且会对工程安全产生影响,因此做好深基坑的降排水施工至关重要。要从设计阶段即进行科学的管理与控制,严格遵循就近排放、综合性及经济性原则,在保证工程施工质量的前提下合理完成施工进度。以某地铁工程为例,对地铁深基坑降排水施工技术进行分析。
Underground water will not only affect the quality of the project, the project progress, but also affect the safety of the project, so it is very important to do the construction of the deep foundation pit for the construction of the de'watering and drainage. From the design stage, we should carry out scientific management and control, strictly follow the principle of near emission, comprehensive and economic, and complete the construction schedule rationally on the premise of guaranteeing the quality of the construction. Taking a subway project as an example, this paper analyzes the construction technology of deep foundation pit dewatering and drainage.
出处
《建筑技术开发》
2018年第15期70-71,共2页
Building Technology Development
关键词
地铁
深基坑
降排水
subway
deep foundation pit
drainage and drainage