期刊文献+

采空区光伏电站建设适宜性评价 被引量:2

Suitability Evaluation of Photovoltaic Power Station Construction in Goaf
下载PDF
导出
摘要 以某50 MWp光伏电站项目的建设为例,详细阐述了在复杂倾斜煤层采空区评价光伏电站建设适宜性的方法和手段,通过收资调查,详细而全面地掌握了场区内各煤层开采深度、范围、终采时间、计划开采情况以及地面变形和破坏程度等资料,主要采用终采时间判定法分区评价光伏板布置区的适宜性,并提出针对性的基础或结构处理措施。该光伏项目工程适宜性评价结论为该项目提供了决策依据,极大地节省了建设工期和投资成本。 Based on the example of the construction of the 50 MWp photovoltaic power station, this paper elaborates the method and means of evaluating the suitability of photovoltaic power station in the complex inclined coal mine. This paper mainly uses the final mining time to evaluate the suitability of photovoltaic panels layout area partitions, and puts forward treatment measures. The evaluation conclusion of the project suitability provides the construction of the project, which greatly saves the construction period and the cost of investment.
作者 叶小波 YE Xiao-bo(Sichuan Electric Power Design and Consulting Co.,Ltd.,Chengdu 610000,China)
出处 《电力勘测设计》 2018年第8期65-70,共6页 Electric Power Survey & Design
关键词 光伏电站 倾斜煤层 采空区. photovoltaic power station inclined seam goaf
  • 相关文献

同被引文献9

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部