10kV电力线路迁改施工风险点及应对措施 被引量:5

Risk Points and Countermeasures of Relocation for 10 kV Power Line
下载PDF
导出
摘要 10kV电力线路迁改作为三电迁改的重难点,严重制约着电气化铁路升级改造的进度。本文通过对电气化铁路升级改造中10kV电力线路迁改施工风险点及应对措施进行分类汇总,以期为同类电力迁改提供参考借鉴,保障电气化铁路升级改造安全高效进行。 The relocation of 10 kV power line is the key and difficulty point of reformation of (the electricity, communications, signals) lines, which severely constrains the progress of upgrading and reconstruction of electrified railways. This article classifies and summarizes the construction risk points and countermeasures of 10 kV power lines in the upgrading and transforming of electrified railways, with a view to providing reference for the similar power relocation and ensuring the safety and efficiency of upgrading electrified railways.
作者 李春炜 Li Chunwei(China Railway Construction Hainan Investment Co.Ltd.,Lingshui Hainan 572400,Chin)
出处 《铁道建筑技术》 2018年第7期118-120,123,共4页 Railway Construction Technology
关键词 电力线路迁改 风险点 应对措施 relocation of the power line risk point countermeasures
  • 相关文献

参考文献3

二级参考文献2

共引文献7

同被引文献37

引证文献5

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部