摘要 目前镇城底矿南六下组煤轨道大巷采用无极绳运输方式,材料设备进入工作面需要多次转载,且矿车容易掉道,安全隐患突出,因此矿方决定采用先进辅助运输方式单轨吊作为南六下组煤的辅助运输方式,通过对悬挂锚杆的锚固力计算,得到轨道锚杆可以有效的承载单轨吊设备的重量的结论。 At present, the coal track roadway of south six lower group of Zhenchengdi mine adopts the mode of transportation without pole rope, the material and equipment need to be reprinted many times into the working face,and the mining car is easy to fall down the road, and the hidden danger of safety is prominent, therefore, It is decided to adopt the advanced auxiliary transportation mode monorail crane as the auxiliary transportation mode of the south sixth coal group. Through the calculation of the anchor force of the hanging bolt, the conclusion that the rail bolt can effectively carry the weight of the monorail hoisting equipment is obtained.
作者 李宝荣 Li Baorong(General Dispatching Room of Xishan Coal Power(Group)Co.,Ltd.,Taiyuan Shanxi 03005)
出处 《机械管理开发》 2018年第6期44-45,64,共3页 Mechanical Management and Development
关键词 单轨吊 悬挂锚杆 载荷计算分析 monorail crane hanging bolt load calculation and analysis
  • 相关文献

参考文献10

二级参考文献44

共引文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部