港上水文站测验河段处在沂河下游段,河段内泥沙含量较大,历史上淤积严重,给水位台连通管设计带来困难。为此,计算了连通管泥沙淤积量,分析了泥沙淤积位置,为连通管的设计提供依据。
The tested river reach of Gangshang station was located in the lower reach of Yi River. The sediment content in the river reach was large and silted up seriously in history, which brought difficulty to the design of connected pipe of Gangshang station water table. In order to provide a basis for the design of the connected pipe, the silting amount in connected pipe was calculated and the silting position was analyzed.
作者
邢亚
万永智
吴成秋
左光祥
XING Ya(Xuzhou Branch of Jiangsu Province Hydrology and Water Resources Investigation Bureau,Xuzhou,Jiangsu 221006)
出处
《农业灾害研究》
2018年第4期27-28,共2页
Journal of Agricultural Catastrophology
关键词
连通管
淤积
分析
Connected pipe
Silting