期刊文献+

浅谈金达煤业综合放顶煤工作面提高煤质的措施 被引量:2

Coal quality control measures in top coal caving of fully mechanized working face in Jinda Coal Industry Co.,Ltd.
下载PDF
导出
摘要 金达煤业对矿区内的10号和11号煤层进行一次性采全高,采用放顶煤采煤工艺,放顶煤开采中的煤质管控困难,导致生产煤质变化大,通过制定一系列的煤质管理制度和现场管理措施,大大提高和稳定了煤炭质量,提高了经济效益。 Fully-seam coal mining and top coal caving method was used in No. 10 and No. 11 coal seam mining in Jinda Coal Industry Co., Ltd., and the coal quality control was difficult and it led to coal quality unstable. Through making a series of management system and field management measures, the coal quality was effectively improved and stabilized, and the economic benefit was also promoted.
作者 任学彬
出处 《中国矿山工程》 2018年第4期37-39,共3页 China Mine Engineering
关键词 放顶煤 开采 煤质管理 top coal caving mining coal quality control
  • 相关文献

同被引文献6

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部