摘要
通过对胜利东二号露天煤矿采场南帮西侧变形区形变的分析,结合技术专家结论及东二号露天煤矿生产经验,提出削帮减载控滑方案,通过稳定系数分析论证了方案的可行性,并提出了完善的安全、技术保障措施。
Based on the analysis of the south slope western deformation zone in Shengli No.2 Open-pit Coal Mine, combining with the conclusion of technical experts and the production experience of No.2 Open-pit Coal Mine, the article puts forward cut-off load shedding, demonstrates the feasibility of the program, and presents the safety and technical support measures.
作者
薛迎军
XUE Yingjun(Inner Mongolia Datang International Xilinhot Mining Co.,Ltd.,Xilinhot 026000,Chin)
出处
《露天采矿技术》
CAS
2018年第4期39-43,共5页
Opencast Mining Technology
关键词
露天煤矿
削帮减载
安全措施
技术措施
open-pit coal mine
cut-off load shedding
safety measure
technical measure