摘要
工程开发与水土保持工作两者是密不可分的,尤其在地势较为陡峭地区,水土保持工作就更显重要。本研究搜集13、14、15年的工程品质核查、抽验资料进行统计分析,汇总目前工程施工质量上较常出现的缺失及主因加以探讨,让水土保持施工缺失降到最低,减少成本浪费与时间消耗,提升水保工程的水准。
Project development and soil and water conservation work are inseparable, especially in the steep terrain, soil and water conservation work is more important. This study collected 13, 14, 15 years of project quality verification, sampling data for statistical analysis, summarized the current quality of the project and the main causes of the lack of water and soil conservation construction to minimize the loss, reduce the cost and time consumption, improve the standard of water conservation projects.
作者
潘奎生
PAN Kui-sheng(The First Engineering Bureau of Henan Water Conservancy,Zhengzhou 450000,Chin)
出处
《价值工程》
2018年第25期206-208,共3页
Value Engineering
关键词
水土保持工程
施工缺失
工程质量
soil and water conservation project
Lack of construction
Engineering quality