盾构切削穿越高强度MPP套管群施工技术

Construction Technology of Shield Cutting through High Strength MPP Casing Pipe Group
下载PDF
导出
摘要 基于上海电力隧道穿越高强度MPP套管工程,针对设备选型及改造、预压浆、施工技术三方面提出应对措施。结果表明:提出的措施能有效解决施工困难,不仅对现实工程具有积极的指导意义,且对后续类似工程施工也具有重要的借鉴作用。 Based on Shanghai electric power tunnel passing through the high strength MPP casing pipe project, relevant measures are put forward for three aspects of equipment selection& transformation, pre-grouting and construction technology. The results show that the proposed measures can effectively solve the construction difficulties, which not only has a positive guiding significance to the practical engineering, but also has an important reference for the follow-up similar projects.
作者 宁寅
出处 《中国市政工程》 2018年第3期80-82,共3页 China Municipal Engineering
关键词 盾构 高强度MPP套管 施工技术 shield high strength MPP casing pipe construction technology