通过对"同步法"测量的技术方法进行分析,采用全站仪一次布站,同时进行剖面测量和导线测量;结合长平矿Ⅲ4323工作面贯通测量实例,对"同步法"测量结果进行分析,其精度满足工程要求。
On the technical analysis of synchronization method,the study used total station to lay position.Meanwhile profile surveying and line surveying were carried out.Combined with the measurement example of 3-4323 working face in Changping Mine,the results of "synchronous method"shows that its accuracy meets the engineering requirements.