地铁盾构法施工中盾构机转接始发技术研讨 被引量:6

Discussion on the Starting Technology of Shield Machine Transfer in Metro Shield Construction
下载PDF
导出
摘要 在地铁隧道施工中,盾构法是较为常用的施工技术,而在盾构施工过程中,盾构始发是关键的施工环节,稍有不慎就会引发安全事故。为确保地铁盾构施工质量和施工安全,施工人员要认真研究盾构机转接始发技术,并合理应用到工程实践中。加强地铁盾构施工技术控制,在最大程度上消除质量安全问题。论文对地铁盾构法施工中盾构机转接始发技术进行探讨,提出相应的质量控制措施,可为施工单位提供参考。 In the course of subway tunnel construction, shield method is amore commonly used construction technology, while in the process of shield construction, the beginning of the shield is the key construction link. A little carelessness will cause safety accidents. In order to ensure the quality of the shield construction and the safety of the construction, the construction personnel need to carefully study the technology of the transfer of the shield machine. It is reasonable to apply it to engineering practice. To strengthen the technology control of subway shield construction and eliminate the problem of quality and safety to the greatest extent. The article discusses the technology of the transfer of shield machine in the construction of the subway shield method, and puts forward the corresponding quality control measures, hoping to provide useful reference for the construction unit.
作者 李俊威 LI Jun-wei(ChinaRailwayEleven Bureau Group City Track Engineering Co.Ltd.,Wuhan 430074,Chin)
出处 《工程建设与设计》 2018年第15期208-209,212,共3页 Construction & Design for Engineering
关键词 地铁盾构法 施工 盾构机转接始发技术 质量控制 metro shield method construction shield machine transfer starting technology quality control
  • 相关文献

参考文献4

二级参考文献20

共引文献13

同被引文献16

引证文献6

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部