摘要
文章首先对常州龙湖郦城3#地块的高层项目进行简单的介绍,根据项目要求介绍了勘察目的,设置了勘察标准。通过实地勘察和分析,对该场地的地形地貌、地质条件、抗震情况进行了分析说明,同时对地基土各分层的成分做了详细说明,并根据工程要求对地基建设给出相应建议,旨在为工程后期的建设提供指导性意见。
First of all, this paper briefly introduces the high level project of No.3 Plot of Longhu Licheng in Changzhou, intro-duces the purpose of investigation according to the requirements of the project, and sets up the survey standard. Through field inves-tigation and analysis, the topographic and geomorphological features, geological conditions and seismic resistance of the site are ana-lyzed and explained. At the same time, the composition of each layer of foundation soil is explained in detail, and corresponding sug-gestions for foundation construction are given according to the engineering requirements. The purpose of the project is to provideguidance for the construction of the later stage of the project.
出处
《科技创新与应用》
2018年第26期141-142,共2页
Technology Innovation and Application
关键词
常州龙湖郦城3#地块
高层
工程勘察
地质条件
岩土工程
No.3 Plot of Longhu Licheng in Changzhou
high-rise
engineering investigation
geological conditions
geotechnical engineering