国瑞·西安金融中心塔楼超高层施工测量过程中,通过建立完整的施工方案与建模,针对施工测量垂直度、竖向轴线引测、高程传递过程,并结合监测数据总结规律,确保了超高层建筑施工顺利。
During super-high tower building construction of Glory Xi'an Financial Center project, complete construction scheme and model creation were prepared. Relevant monitoring data of construction measurement verticality, longitudinal axial pilot testing and elevation transmission were studied to summarize the laws and guarantee the smooth construction of super-high building.
作者
汪潇驹
钟树贤
陶庆会
刘海涛
张雪斌
贾向辉
WANG Xiao-ju;ZHONG Shu-xian;TAO Qing-hui;LIU Hai-tao;ZHANG Xue-bin;JIA Xiang-hui(Beijing Fourth Construction & Engineering Co.,Ltd.,100075,Beijing,China)
出处
《建筑技术》
2018年第7期724-726,共3页
Architecture Technology
关键词
超高层建筑
控制基点
垂直度
标高传递
super-high building
control base point
verticality