深部孤岛工作面末采遭遇断层收尾技术实践 被引量:1

Technical Practice of Fault Closure in Deep Island Working Face
下载PDF
导出
摘要 针对深部孤岛综采工作面在末采期间,位于三角区且遇到断层,利用层位对比和断层揭露情况分析断层走势,合理确定停采线位置,优化了收尾过断层方案。首次实施由顶板注浆改为煤壁注浆施工工艺,确保过断层有效控制顶板。两巷采取掏槽木垛、加长超前支护、支架架脚点柱措施,为顺利收尾创造了条件。给出了抹角大小确定方法,不但保证了设备回撤空间,而且减少了工程量。 In view of the deep island comprehensive mining face in the late mining period ,it is located in the triangle area and encounters faults. For the first time, the top grouting technology was changed from top grouting to coal wall grouting technology to ensure the effective control of top grouting. The two lanes adopt the measures of cutting wood pallets,lengthening leading support and stent foot column,which create the conditions for a smooth end. The method of determining the indirect size is given, which not only guarantees the return space of the equipment,but also reduces the quantity of the project.
作者 杨睿 YANG Rill(No.6 Mine, Pingdingshan Tian'an Coal Industry Company Limited, Pingdingshan 467091, China)
出处 《煤炭技术》 CAS 2018年第7期31-34,共4页 Coal Technology
关键词 收尾 煤壁注浆 掏槽木垛 架脚点柱 ending coal wall grouting cut wood crib wearing the foot column. .
  • 相关文献

参考文献6

二级参考文献34

共引文献82

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部