期刊文献+

贵阳市轨道交通工程主要岩土工程问题 被引量:8

Major Geotechnical Engineering Problems of Rail Transit Project in Guiyang City
下载PDF
导出
摘要 贵阳城市轨道交通工程以地下线为主,少量高架线及地面线,施工中存在的主要岩土工程问题有:围岩稳定问题,涌水突泥问题,隐伏岩溶问题,地面塌陷问题,明挖基坑的边坡稳定、基坑涌水及岩溶地基稳定问题,桩基及高回填地基稳定问题等。结合工程实践,从暗挖隧道、明挖基坑、桩基及高回填地基这3种形式入手,对贵阳城市轨道交通建设施工中的存在的主要岩土工程问题进行了探讨,并提出了针对性的处理措施。 The urban rail transit projects in Guiyang City are dominated by underground lines with a few elevated lines and ground lines. The main geotechnical engineering problems in project construction include the stability of surrounding rock,water inrush and mud inrush,hidden karst,ground subsidence,pile foundation and high backfill foundation stability and the slope stability,foundation pit water inflow and karst foundation stability of open excavated foundation pit. In combination with engineering practices,the major geotechnical engineering problems in the construction of Guiyang urban rail transit project are discussed from three structure forms of open excavated tunnel,open excavated foundation pit and pile foundation and high backfill foundation,and the targeted treatment measures are also proposed.
作者 陈再谦 胡政 CHEN Zaiqian;HU Zheng(PowerChina Guiyang Engineering Corporation Limited, Guiyang 550081, Guizhou, China)
出处 《水力发电》 北大核心 2018年第7期20-24,46,共6页 Water Power
关键词 城市轨道交通工程 岩溶 岩土工程问题 处理措施 urban rail transit project karst geotechnieal engineering problem treatment measures
  • 相关文献

参考文献7

二级参考文献29

共引文献135

同被引文献89

引证文献8

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部