摘要
实践证明,架桥机安装高桩码头预制构件的施工工艺可以显著提高预制构件安装精度、恶劣海况下构件安装效率与施工安全。鉴于此,论文以广东石化产品码头为例,对架桥机安装预制构件施工技术进行分析研究,以供参考和借鉴。
Practice shows that the construction technology of installing precast components of high pile wharf by bridge erection machine can effectively improve the ofpreeast components, and the installation efficiency and construction safety under the severe sea condition. Based on this, paper takes the Guangdong petrochemicals wharf as an example, analyzes the construction technology of installing precast components by bridge erection machine, for reference.
作者
齐计国
刘玉亮
QI Ji-guo;LIU Yu-liang(CCCC Fiith Engineering Co. Ltd., Jieyang 515235,China)
出处
《工程建设与设计》
2018年第12期169-171,共3页
Construction & Design for Engineering
关键词
架桥机
高桩码头
施工工艺
bridge erecting machine
high pile wharf
construction technology