架桥机安装预制构件施工技术 被引量:7

Construction Technology of Installing Prefabricated Components by Bridge Erection Machine
下载PDF
导出
摘要 实践证明,架桥机安装高桩码头预制构件的施工工艺可以显著提高预制构件安装精度、恶劣海况下构件安装效率与施工安全。鉴于此,论文以广东石化产品码头为例,对架桥机安装预制构件施工技术进行分析研究,以供参考和借鉴。 Practice shows that the construction technology of installing precast components of high pile wharf by bridge erection machine can effectively improve the ofpreeast components, and the installation efficiency and construction safety under the severe sea condition. Based on this, paper takes the Guangdong petrochemicals wharf as an example, analyzes the construction technology of installing precast components by bridge erection machine, for reference.
作者 齐计国 刘玉亮 QI Ji-guo;LIU Yu-liang(CCCC Fiith Engineering Co. Ltd., Jieyang 515235,China)
出处 《工程建设与设计》 2018年第12期169-171,共3页 Construction & Design for Engineering
关键词 架桥机 高桩码头 施工工艺 bridge erecting machine high pile wharf construction technology
  • 相关文献

参考文献2

二级参考文献3

共引文献7

同被引文献27

引证文献7

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部