摘要
盾构施工中不可避免下穿建(构)筑物,如何确保盾构施工中建(构)筑物的安全是我国大规模城市轨道交通建设中所必须面对和解决的问题,以上海轨道交通五号线南延伸段某区间为例,探讨了盾构长距离小半径穿越建(构)筑物沉降安全控制措施,有关经验可供相关专业人员参考。
The shield construction is unavoidable to tunnel the buildings(structures). How to ensure the safety of buildings(structures) in the shield construction is the problem having to face and solve in the construction of large-scale urban rail transit in China. Taking an area of the south extension section in Shanghai Metro Line 5 as an example, the article discusses the settlement safety control measures for the long-distance small-radius shield tunneling the buildings(structures). The relative experience can be referred for the similar projects.
出处
《城市道桥与防洪》
2018年第6期200-202,210,共4页
Urban Roads Bridges & Flood Control
关键词
穿越
长距离
小半径
建(构)筑物
tunneling
long-distance
small-radius
buildings(structures)