苏州西京湾上山港闸站工程采用钢坝闸门,止水钢板埋件单块尺寸大,重量重,一般采用二期混凝土安装。该工程要求在汛前完成水下验收,工期特别紧,采用常规的施工技术,难以满足工期要求。
The sluice gate of steel dam is adopted in Shangshan harbor station of Suzhou Xijing bay, the single block of water sealing steel plate is large and heavy, it generally used in secondary concrete installation. the underwater acceptance must be completion before flood season for this project, the construction period is very tight. It is difficult to meet the requirement of construction period with conventional construction technique.