摘要
为解决阿湖水库蓄水与防洪矛盾,保证水库防洪安全,本文通过比较两种方案在投资、施工、管理等方面的优缺点,优选出溢洪道扩建方案。优选方案具有较好的适应能力并可以适当降低工程造价。
In order to resolve the contradiction between reservoir impounding and flood control,and ensure the safety of reservoir flood control,the spillway expansion plan was optimized by comparing the advantages and disadvantages of these two schemes in investment,construction and management.The scheme has good adaptability and can reduce the project cost appropriately.
作者
夏辉
徐波
陈伟
XIAHui,XUBo,CHEN Wei(1. Jiangsu Surveying and Design Institute of Water Resources Co. , Ltd . ,Yangzhou 225217, China;2. School of Hydraulic Energy and Power Engineering,Yangzhou University,Yangzhou 225009, Chin)
出处
《水利科学与寒区工程》
2018年第3期9-12,共4页
Hydro Science And Cold Zone Engineering
基金
国家自然科学基金青年科学基金项目(51409227)
江苏省博士后科研资助计划项目(1501115B)
长江科学院开放研究基金资助项目(CKWV2016386/KY)
关键词
溢洪道
隧洞
方案比选
设计方案
spillway
tunnel
scheme comparison and selection
design scheme