摘要
拟建尾矿库位于西藏甲玛铜多金属矿二期西南面的果郎沟山沟,工程筑坝材料以废石料为主,筑坝料场就近选择,优先考虑库内。根据设计要求,拟采用尾砂作为子坝筑坝材料,该项目土工试验项目除了坝基、库区内岩土试验项目外,需要对一期尾砂采样并模拟实际工况进行抗剪强度试验及进行相关测试,检测项目主要为:尾矿的物理和力学性质试验;尾矿的平板载荷试验;模袋震动密实试验。试验结果表明,尾砂在不同的状态下,含水率和密度的变化对尾砂的力学指标有较为显著的影响。
The proposed tailing reservoir is located at the Qianglanggou gully in the southwest of the Second Phase Development of the Jiala Copper Polymetallic Deposit in Huatailong Mine,Tibet.The tailing dam fill material is predominantly waste soil and rock from the mining operation.The additional borrow material should be directly from local site with a priority consideration of areas inside the reservoir.This paper presents the geotechnical test results on the tailing sands and other materials under construction conditions.The tested items are:Physical and mechanical properties of tailing sands,in-situ plate loading test and mold bag vibration compact tests.The results indicate that,the moisture content and density are significantly affecting the mechanical properties of the tailing sands;
作者
徐凡
杨永晶
李吉权
XU Fan;YANG Yongjing;LI Jiquan(Wuhan Surveying Geotechnieal Research Institute Co. Ltd. , MCCC, Wuhan, 43008)
出处
《土工基础》
2018年第2期229-232,共4页
Soil Engineering and Foundation
关键词
筑坝尾砂
物理及力学性
泌水性
渗透性
竖向静载试验
模袋震动密实试验
Tailing Sand for Dam Construction
Physical and Mechanical Properties
Bleeding
Permeability
Axial StaticLoading Tests
Mold Bag Vibration Compaction Test