通过对低温热水地面辐射供热系统结构层空鼓、开裂可能导致的后果进行系统分析,从结构层施工技术、施工过程管理、二次家装、供热系统运行管理等方面,对防治结构层空鼓、开裂提出了具体的防治措施。
Through systematic analysis of the low temperature hot water floor radiant heating system structure layer hollowing and cracking may lead to consequences,from the structural layer construction technology,construction process management,the two home heating system,operation management and so on to remind developers,on the prevention and control of structure layer hollowing and cracking proposes concrete preventive measures.
作者
余永文
Yu Yongwen(Yang Coal Real Estate Construction Group Co. , Ltd, Yangquan 045000, Chin)
出处
《山西建筑》
2018年第10期77-78,共2页
Shanxi Architecture
关键词
地暖
结构层
防治措施
floor
structure layer
prevention measures