摘要
针对石家庄地铁行政中心站~园博园站区间段出现的隧道轴线偏移过大问题,在总结产生偏差的主要原因的基础上,提出了一种新的成型管片轴线控制技术应用于该工程,并从测量和施工两方面详细阐述了该技术的原理和实施方法。
According to the Shijiazhuang subway station, the administrative center of the park station interval tunnel axis offset problem is too large, the main reasons are summarized based on the deviation on, put forward a new molding segment axis control technology applied to the project, and from two aspects of construction measurement and expounds the principle and implementation method technology.
作者
李瑞
LI Rui(Cr 17bg No.6 Engineering Co.Ltd., Shijiazhuang 050899,Chin)
出处
《工程建设与设计》
2018年第7期233-235,共3页
Construction & Design for Engineering
关键词
地铁隧道
轴线控制施工
导向系统测量
subway tunnel
axis control construction
guide system measurement