6Lindsey Sebastian Bryson,"Performance of a stiff excavation an adjacent building" A dissertation submitted to the graduate school in Partial fi.tlfillment, of the requirements for the degree doctor of PhilosoPhy field of civil engineering,Evanston,Illinois.D eeember2002. 被引量:1
7Anderson,Thomas .C .Sceant piles support aceess shafts for tunnel crossing indifl~eult geologic conditions.Geoteehnieal Speeial Publieation, n124, Geosupport 2004-Drilled Shafts,MicroPiling, Deep Mixing, Remedial Methods, and Specialty Foundation systems,Proceedings of Sessions of the GeoSupport Conferenee: Innovation and Cooperation in Geo,2004,P299-308. 被引量:1
8Arturo Ressi di Cervia Construetion of the deep eut-offat the Walter E George dam.Proceedings of Sessions of the GeoSupport Conferencelnnovation and CooPeration in Geo, 2004. 被引量:1
9Miehele Calvello, Richard J. Finno. Selceting parameters to optimize in model calibration by inverse analysis[j]. Computers and Geoteehnics 31(2004):411-425. 被引量:1
10Laefer,Debra Fen. Prediction and Assessment of Ground Movement and Building Damage induced by Adjacent Exeavation.University of Illinois at Urbana-Champaign , ph,D.2001. 被引量:1