期刊文献+

厦门市筼筜污水厂提标改造工程方案分析 被引量:3

Study on analysis of reconstruction technical process of Yun Dang wastewater treatment plant
下载PDF
导出
摘要 筼筜污水处理厂采用组合式高效沉淀池+前置反硝化(BIOFOR)生物滤池工艺,出水达到GB18918-2002中的一级B标准.对污水厂现状运行状况进行分析论证,最终采用"预处理+BIOFOR曝气生物滤池+后置反硝化生物滤池+高速气浮池+加氯接触池"的提标改造工艺,处理水质达到GB18918-2002中的一级A标准. Yun Dang wastewater treatment plant (WTP) is using combined efficient sedimen- tation tank + pre denitrification(BIOFOR) biological filter process, with level 1 B effluent in the standard of GB18918 -2002. After analyse the running status of the WTP, the upgrade reconstruction technical process of "pretreatment + BIOFOR aeration biological filter + rear denitrifying biological filter + high - speed air flotation tank + chlorination contact pool" was adopted, with level 1 A effluent in the standard of GB18918 -2002
作者 费霞丽 FEI Xia-li(Xiamen Water Group Ltd. Co. , Xiamen 361009, Chin)
出处 《哈尔滨商业大学学报(自然科学版)》 CAS 2018年第1期49-53,共5页 Journal of Harbin University of Commerce:Natural Sciences Edition
基金 黑龙江省自然科学基金(E201355)
关键词 污水厂提标 曝气生物滤池 反硝化生物滤池 脱氮除磷 wastewater treatment plant upgrade biologic aerated filter denitrifying biologi-cal filter phosphorus removal
  • 相关文献

参考文献2

二级参考文献2

共引文献62

同被引文献12

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部