摘要 在铁路建设工程中,设置大临工程是保证工程建设顺利实施的重要辅助工程。其设置是否科学合理,不仅影响到工程投资,还会影响到建设进度和工程质量等。为此,此文以东北某新建高速铁路工程为例,针对工程建设规模和特点,对1处铺轨基地和1处轨道板预制场设置方案进行分析比较,提出推荐方案。 The construction of large temporary project is an important auxiliary project to ensure the smooth implementation of railway project construction. The scientific and reasonable of its setting not only affects the project investment, but also affects the construction progress and project quality. Therefore, taking a new high speed railway project in Northeast China as an example, the setting scheme of a track laying base and a track plate prefabrication field is compared and analyzed according to the engineering construction scale and characteristics. And the recommended scheme is proposed.
作者 孔令然
出处 《铁路工程技术与经济》 2018年第2期36-38,共3页 Railway Engineering Technology and Economy
关键词 铁路建设 铺轨基地 轨道板预制场 设置方案 比选 Railway construction Track laying base Track plate prefabrication site Setup scheme Compare
  • 相关文献

参考文献2

二级参考文献24

  • 1李闻.铁路客运专线预制梁场提梁机轨道梁设计综述[J].铁道工程学报,2007,24(S1):248-250. 被引量:3
  • 2铁建设[2008]189号,铁路大型临时工程和过渡工程设计暂行规定[S]. 被引量:4
  • 3中华人民共和国铁道部.铁路工程施工组织设计指南,2010. 被引量:1
  • 4孙国新.秦沈客运专线大临工程设计中几个特殊问题的探讨[C],2000. 被引量:1
  • 5中华人民共和国铁道部.铁建设[2009]89号关于加强铁路大型临时工程设计和审查工作的通知,2009. 被引量:1
  • 6中华人民共和国铁道部.铁路大型临时工程和过渡工程设计暂行规定,2008. 被引量:2
  • 7中铁第五勘察设计院集团有限公司.铁路混凝土拌和站建设技术研究报告,2011. 被引量:1
  • 8铁道部工程管理中心;中铁第五勘察设计院集团有限公司.客运专线铁路预制轨道板(枕)场建设手册,2009. 被引量:1
  • 9铁道部经济规划研究院.铁路后张法预应力混凝土梁预制场建设技术指南,2009. 被引量:1
  • 10中铁第五勘察设计院集团有限公司.通桥(2009)8301铁路箱梁预制场平面布置图,2009. 被引量:1

共引文献21

同被引文献13

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部