摘要
随着改革开放的不断深入,中部崛起和长江经济带的不断发展极大地促进了长江内河流域物流运输产业的发展。近年来,湖北境内的码头和陆域工程获得了飞速发展,码头装卸生产向大型化、快速化、高自动化、信息化方向迈进。随之而来的对于码头陆域地基基础技术参数要求也越来越高,论文以黄石港棋盘洲港区一期陆域形成工程为例,对码头道路堆场工程地基处理技术进行研究分析,并总结出该地区地基处理施工技术的可行方法。
With the deepening of reform and opening up, the continuous development of the central region and the continuous development of the Yangtze River Economic Zone have greatly promoted the devolpement of logistics and transport industry in the Yangtze River Basin. Recent yeas, the territory of Hubei terminals end land-based projects have been rapid development, terminal loading and unloading production translate to large-scale, rapid, high automation, information technology direction. As a result, the requirements for basic technical parameters of wharf foundation are higher end higher. This paper takes the first phase of the lend formation project in the Qipanzhou harbor district of Huangshi harbor as an example to analyze the foundation treatment technology of the terminal road yard project, and then summarizes the feasible methods of the foundation treatment technology in this area.
出处
《工程建设与设计》
2018年第4期43-45,共3页
Construction & Design for Engineering
关键词
码头道路
堆场工程
地基处理技术
管井降水强夯
terminal road
yard project
foundation treament technology
tube well precipitation dynamic compaction