结合长江上3.5万吨级通用码头的设计案例,探讨在散杂货码头给水系统、排水系统、消防系统设计过程中遇到的疑难问题,寻求合理的解决方案。码头上有种类繁多的管道,应根据船舶的停靠、码头上工艺的布置等选用明装、暗装、架空等不同敷设方式。此外,详细介绍了码头污水量计算及集污水池设计方法,并探讨了消防系统水源的选择、消防用水量计算及消防给水系统的选择方法。
The real project design case of 35 000 dwt wharf on the Yangtze River was taken as an example, the difficult problems existed in water supply, drainage system and fire fighting system encoun- tered in the design process were discussed. Since there are various kinds of pipelines in the terminal, so the layout such as exposed, concealed and overhead, should be used according to the docks of the ship, the layout of the craft on the wharf and so on. In this paper, the wastewater quantity calculation and wastewater collection tank design were introduced, and the source of fire water supply, fire water quantity calculation, selection of fire water supply system were proposed as well.
出处
《中国给水排水》
CAS
CSCD
北大核心
2018年第6期45-48,共4页
China Water & Wastewater
关键词
码头
管道敷设
初期雨水
消防水源
wharf
pipeline laying
initial rainwater
fire water source