660 MW机组低负荷运行负荷优化分配方法研究 被引量:4

Research on Load Dispatching of 660MW Power Plant under Low Load Operation
原文传递
导出
摘要 随着煤电机组总体负荷率的降低,长时间的低负荷运行逐渐成为常态。基于某电厂660 MW超临界机组全负荷段的锅炉效率、汽机热耗率、厂用电率试验数据,计算得出全负荷段煤耗率,并从经济性角度分析在不同电厂总负荷率条件下中单台机组的临界调峰时间、2台机组单元的最优负荷分配方法和全厂4台机组的最优负荷分配方法。 With the decrease of average load ratio of coal-fired power plants, the power units are running under low load in long term. Boiler efficiency, turbine heat rate, auxiliary power ratio of a 660 MW supercritical unit under low load was obtained by experiments and the net coal consumption rate was calculated. Afterwards, the critical time for unit shutdown strategy of a single unit as a function of unit load was investigated. Finally, the load dispatching methods between two units and among plant-level four units under various plant load ratio were proposed from the economic point of view.
出处 《电站系统工程》 2018年第1期9-11,15,共4页 Power System Engineering
关键词 低负荷 煤耗 负荷分配 临界调峰时间 low load net coal consumption rate load dispatching critical peaking time
  • 相关文献

参考文献7

二级参考文献54

共引文献173

同被引文献43

引证文献4

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部