5Zhong K M, Guo P Q, Chi Q. Two approaches for greenization of fixture design and corresponding technology innovation[A]. Materials Science Forum[C]. 2004,471~472: 477~480. 被引量:1
7Noble J S. Tanchoco J M A. A framework for material handling system design justification. Intemational Journal of Ptoduction Research,1993.31(1):81-106. 被引量:1
8Yavuz A B,Chih-kuan Y. Intelligent dispatching rules for trip-based material handling systems. Journal of Manufacturing Systems.1996,15(4):226-238. 被引量:1