基于引水限制调度线的并联水库系统供水优化算法及应用 被引量:6

Water diversion-limitation scheduling line-based optimized algorithm for water supply of parallel reservoirs system and its application
下载PDF
导出
摘要 以实现梯级水库群或者水源连通工程水量补偿式调节为目标,针对并联水库的联合供水特征,采用引水限制调度线控制引水水库可引水量,引入粒子群算法构建了并联水库优化调度模型。通过优化引水调度线提出可以改进并联水库系统的调度规则和调度方法,将优化和常规调度有机结合,并根据并联水库系统实际运行条件设置模型的目标函数、约束条件和参数设置方法。以X市S水库和L水库组成的并联水库系统为实例,采用该模型进行优化模拟。结果表明:并联水库系统经优化年均弃水量比两库单独供水的弃水量减少5 496万m^3,末库容比两库单独供水时提高203万m^3。在95%供水保证率时,并联水库系统供水系统的年供水能力比双库单独供水能力之和提高了5 556万m^3。优化形成的引水限制调度线分布形态合理,并联供水系统经过优化大幅度提高了水库系统的供水能力,证明了基于引水限制调度线的并联水库系统供水优化算法的可行性,该方法对并联水库联合调度具有重要参考价值。 By taking realizing the compensative regulation of the water amount of cascade reservoir group or water source connection project as the study object and aiming at the joint-water supply characteristics of parallel reservoirs,the water diversionlimitation scheduling line is adopted to control the available water diversion amount from the water diverted reservoir,and then the particle swarm optimization algorithm is introduced to establish the optimized operation model for the parallel reservoirs.Through proposing the optimized water diversion-limitation scheduling line,both the scheduling rule and the scheduling method of reservoirs can be paralleled to organically combines the optimized scheduling with the conventional one,furthermore,the objective functions,constraint conditions and parameter setting method for the model are set up in accordance with the actual operation condition of the relevant parallel reservoirs system. Taking the parallel reservoirs system composed of S reservoir and L reservoir in X city as the actual case,the optimization simulation is carried out with this model. The result shows that through the optimization,the mean annual abandoned water of the parallel reservoir system is reduced by 54. 96 million m3,if it is compared with that from the individual water supply from both the reservoirs,while the final storage capacity is increased by2. 03 million m3,if it is compared with that when water is individually supplied by both the reservoirs. When the water supply guarantee rate is 95%,the annual water supply capacity of parallel reservoir system is increased by 55. 56 million m3,if it is compared with that from the individual water supplies of both the reservoirs. As the distribution pattern of the optimized water diversion-limitation scheduling line is reasonable,the water supply capacity of the parallel reservoirs system is largely increased after the optimization,by which the feasibility of the water diversion-limitation scheduling line-based optimized algorithm for the water supply of
出处 《水利水电技术》 CSCD 北大核心 2018年第2期8-14,共7页 Water Resources and Hydropower Engineering
基金 流域水循环模拟与调控国家重点实验室课题(2016TS04) 国家自然科学基金项目(41401648 51279210 71573274) 工程院重大咨询战略项目(2016-ZD-08-05) 国家重点研发计划(2017YFC0404405)
关键词 并联水库 引水限制调度线 粒子群算法 水资源优化配置 水资源调度 水库群联合调度 parallel reservoir system water diversion-limitation scheduling line particle swarm optimization algorithm optimal allocation of water resources water resources scheduling joint-scheduling of reservoir groups