摘要
结合国内烟气脱硫装置的运行实际,介绍有关政府环保部门就脱硫烟道旁路拆除、封堵的规定和要求;分析了燃煤锅炉烟气脱硫旁路拆除的必要性和对工艺运行的影响,并提出拆除烟道旁路后采取的相应技改措施。
Based on actual operation of the domestic flue gas desulfurization unit,the regulations and requirements by relevant environmental protection authorities for the dismantling and sealing of desulfurization flue duct bypass are outlined,and the necessity for dismantling the coal-fired boiler desulfurization flue duct bypass,and the impact on the process operation is analyzed. Relevant measures are proposed for technical revamp after dismantling the flue duct bypass.
出处
《硫磷设计与粉体工程》
2017年第6期29-32,共4页
Sulphur Phosphorus & Bulk Materials Handling Related Engineering
关键词
烟气脱硫
旁路拆除
必要性
工艺影响
技改措施
flue gas desulfurization
bypass dismantling
necessity
process impact
technical revamp measure