摘要
文中主要详细介绍了明挖导流、定向钻进、主河槽填筑、沉管法四种穿汾河方案,经方案投资、工期、施工方面等的考虑,综合推荐沉管法穿越汾河。
The papre mainly introduces four schemes of crossing the Fen River for the Yangqu Water Supply Project.They are the excavation of diversion,the directional drilling,the main channel filling and the immersed tube method.Through considering the investment,the construction period and other apsects of construction,the immersed tube method of crossing the Fen River is recommended.
出处
《山西水利科技》
2018年第1期35-38,共4页
Shanxi Hydrotechnics
关键词
穿汾河
方案
分析
比选
crossing the Fen River
scheme
anlysis
comparision and selection