2G频率重耕风险管理研究 被引量:1

Research on GSM Frequency Refarming Risk Management
下载PDF
导出
摘要 将项目管理中的风险研究应用到通信领域的工程项目管理,通过风险识别、风险估计和风险评价找到进行风险控制的关键要素。使用以大数据分析为抓手的方法论,制定了根据用户价值结合市场签转分3步走的方案,从技术和管理2个方面针对设计方案、投资费用风险、用户流失等关键性的风险因素实施了风险控制。最终项目目标得以实现,同时提供了经验,降低企业运营的风险。 The risk investigation of the project management is applied to the project management in communication field. Risk identification,risk evaluation and risk assessment are used to find the key elements of risk control. By focusing on the methodology based on the big data analysis,a three-step plan is set up in accordance with the value of the users and the market signing.Aiming at design scheme,investment cost risk,user loss and so on,the risk control is implemented from technology and management. Finally,the goal of the project is realized and it provides the experiences and reduces the risk of business operation.
作者 桑红梅
出处 《邮电设计技术》 2018年第2期37-39,共3页 Designing Techniques of Posts and Telecommunications
关键词 频率重耕 反向升级 大数据分析 风险研究 Frequency refarming Reverse upgrade Big data Risk research
  • 相关文献

参考文献14

二级参考文献6

共引文献42

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部