摘要
采用经验公式、理论分析、结合实船测试验证的方法对三峡船闸浮式系缆桩系泊安全性进行分析,得出浮式系缆桩改造前后安全过闸所能适应的船舶吨级范围,并对三峡船闸浮式系缆桩实际系泊操作提出有益建议。
Combining the empirical formula,theoretical analysis with verification by real ships,the mooring safety of the floating mooring bit in Three Gorges ship lock were analyzed to obtain the ship's tonnage range adapt to safety pass the ship lock before and after of the reconstruction of floating mooring bit. Some useful suggestions were set forth for the actual mooring operation of the floating mooring bit.
出处
《船海工程》
北大核心
2018年第1期158-162,共5页
Ship & Ocean Engineering
基金
工业与信息化部高技术船舶科研项目
关键词
三峡船闸
浮式系缆桩
系泊分析
实船试验
three gorges ship lock
floating mooring bit
mooring analysis
real ship verification