期刊文献+

彬长矿区上行开采覆岩变形数值模拟分析 被引量:1

Numerical simulation analysis on the overburden deformation during ascending mining in Binchang mining area
下载PDF
导出
摘要 为合理并充分利用化石能源,使经济效益最大化,提高煤炭回采率尤为重要。文章以岩石力学及岩石破坏准则为依据,运用BAQUS有限元模拟软件,对彬长矿区水帘洞煤矿三采区4煤上行开采方法的可行性进行研究,为彬长矿区同地质条件矿井的遗留煤层开采提供了理论依据。 In order to make full use of fossil fuels,maximize economic benefits,it is particularly important to improve coal recovery rate. Based on the theory of rock mechanics and rock failure criterion,the feasibility of the ascending mining method for 4#coal seam in third panel of Shuiliandong Coal Mine in Binchang mining area was studied by using BAQUS finite element simulation software,which can provide theoretical basis for mining the remained coal seams with similar geological conditions in Binchang mining area.
作者 张黎明
出处 《陕西煤炭》 2017年第3期40-43,共4页 Shaanxi Coal
关键词 上行开采 覆岩变化 数值模拟 可行性 ascending mining overburden deformation numerical simulation feasibility
  • 相关文献

参考文献4

二级参考文献28

共引文献30

同被引文献9

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部