基于CFD的映秀湾电站过流部件的分析 被引量:3

An Analysis of the Yingxiuwan Power Station Flow Components Based on CFD
下载PDF
导出
摘要 在对映秀湾电站水轮机转轮进行成功改造之后,选取了合适的转轮,为了确定新选取的转轮与映秀湾电站原过流部件匹配是否合理。利用计算流体动力学方法(CFD)对映秀湾电站原有的过流部件进行计算分析,从而判断映秀湾电站原过流部件是否需要进行更换或者进行局部修型,从而达到此次映秀湾电站改造的目标,从而提高机组稳定运行的能力。在分别对蜗壳和固定导叶,固定导叶和活动导叶进行联合计算后,结果表明,新选出的转轮与原过流部件是相匹配的,在映秀湾电站的改造过程当中不需要对过流部件进行修型。 After the successful transformation of Yingxiuwan Power Station turbine runner,an appropriate runner was selected to determine the selection of the new runner and primary flow components of Yingxiuwan Power Station is reasonable. The computational fluid dynamics(CFD) method is used to calculate and analyze the original power flow components of Yingxiuwan. The original flow components of Yingxiuwan Power Plant need to be replaced. By combining the calculation of spiral case and fixed guide vane,fixed guide vane and guide vane,results show that,the newly selected runner is matched with the original flow passage component. In the transformation of the power of Yingxiuwan,it is not necessary to flow over parts of the shape modification.
出处 《中国农村水利水电》 北大核心 2018年第1期174-177,183,共5页 China Rural Water and Hydropower
关键词 映秀湾水电站 过流部件 修型 CFD Yingxiuwan Hydropower Plant flow components shape modification CFD
  • 相关文献

参考文献4

二级参考文献27

共引文献69

同被引文献23

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部