摘要
从垫层料加工、生产性碾压试验和垫层料填筑施工工艺等几个方面对新疆阿尔塔什大坝垫层料填筑施工质量控制进行了详细介绍,通过渗透系数和相对密度检测对垫层料填筑施工质量进行评价,结果表明,阿尔塔什大坝垫层料填筑施工质量受控。
The quality control of cushion material filling construction in Aertashi Dam in Xinjiang is introduced in detail from the aspects of cushion material processing, productive rolling compaction tests and cushion filling construction process. The quality of cushion material filling is also evaluated through permeability coefficient detection and relative density testing. The results show that the quality of cushion material filling of Aertashi Dam is in control.
出处
《水力发电》
北大核心
2018年第2期71-73,共3页
Water Power