期刊文献+

友谊灌区黄旗闸工程改造总布置及计算 被引量:8

General layout and calculation of Huangqi Lock Project transformation in Youyi Irrigation District
下载PDF
导出
摘要 由于河道变化和河道淤积,导致纳潮能力减弱,严重影响灌区供水能力。由于河势变化,致使提水工程的进水口或口门淤塞,流量减少,或河床下切,水位降低,造成提水困难。针对上述问题,对闸门、启闭设备的布置、无水闸观测设施及自动化设施进行了改造,采用《水力计算手册》中的方法进行计算,其计算结果合理。该工程改造后显著地改善了防洪、排涝、灌溉、治污等方面的效果。 The tidal prism ability is weakened due to river change and river siltation, thereby affectinof the irrigation district severely. The water inlet or entrance is blocked, and the flow capacity is reduced due to riverregime change in pumping engineering, or the river bed is undercut, the water level is decreased, pumping. The project plays a significant role in flood control, drainage, irrigation, pollution control, etc. aftertransformation.
作者 薛丽
出处 《水利建设与管理》 2018年第1期16-19,共4页 Water Conservancy Construction and Management
关键词 黄旗闸工程 改造 布置 计算 友谊灌区 Huangqi lock project transformation layout calculation Youyi Irrigation District
  • 相关文献

参考文献6

二级参考文献9

共引文献30

同被引文献41

引证文献8

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部